Dubai’s Marina air taxi terminal has been completed and certified by the UAE’s aviation regulator, establishing the infrastructure for a planned electric aircraft connection with Dubai International Airport.
Skyports Infrastructure and Dubai’s Roads and Transport Authority (RTA) announced on Wednesday that the Dubai Marina Vertiport, designated VMR, had received certification from the General Civil Aviation Authority (GCAA) for commercial electric vertical take-off and landing operations.
The approval makes VMR the second certified terminal in Dubai’s proposed air taxi network, after VDX near Dubai International Airport. The two facilities form what the project partners describe as the world’s first permanent, certified vertiport-to-vertiport route for electric air taxis.
However, certification of the ground facilities does not mean passenger flights have started. Commercial services remain dependent on separate operational approvals and completion of preparations by Joby Aviation, the aircraft operator. No confirmed launch date or passenger fare has been announced. The airport-to-Marina link is therefore infrastructure-ready, not yet an operating public transport service.
Once operating, the service is expected to cover the journey between the airport terminal and Dubai Marina in less than 10 minutes, compared with approximately 35 minutes by road. These are projected journey times rather than measured performance from a scheduled passenger service.
Joby plans to operate four-passenger electric aircraft capable of vertical take-off and landing, with a maximum speed of about 200 miles per hour. Passengers are expected to book individual seats rather than charter entire aircraft. The company says its aircraft produce no emissions during flight and are designed to generate comparatively little noise, characteristics considered important for operations around populated districts.
The Marina facility stands beside the American University in Dubai and within walking distance of Al Fardan Exchange Metro Station. Its location is intended to provide connections to residential and leisure areas around Dubai Marina and commercial districts including Dubai Internet City, while allowing passengers to continue journeys using the metro.
Skyports says the terminal can accommodate up to 21,000 aircraft landings annually and handle as many as 84,000 passengers. It includes an elevated take-off and landing area, charging equipment and a passenger terminal.
A separate aircraft parking space allows an electric air taxi to stand without obstructing the principal landing area, enabling another aircraft to use it. Skyports says the design also draws on standards used for offshore aviation facilities to support structural resilience and operational safety.
The GCAA certified VMR under its CAR AGA Part VFI framework governing vertiports. VDX had already received certification in July, creating the regulatory foundation for the first connection once the Marina site secured approval. Certification addresses the suitability of the ground facilities, while the aircraft operator must separately satisfy applicable requirements before carrying paying passengers. An official ceremony marking the certification was held at the facility on 3 November, ahead of Wednesday’s public announcement of the project’s completion.
Ahmed Bahrozyan, chief executive of the RTA’s Corporate Technology Support Services Sector and chairman of its Autonomous Transport and Aerial Taxi Committee, said the development would help integrate the proposed aerial service with Dubai’s existing public transport system.
Aqeel Ahmed Al Zarouni, the GCAA’s assistant director-general for aviation safety affairs, said two certified facilities represented progress towards a regulated advanced air mobility network, with safety oversight and cooperation between authorities and private operators central to its development.
Addison Ferrell, director at Skyports Infrastructure, said completion and certification of both terminals established the ground facilities needed for the first permanent route. The infrastructure provider is working with the RTA, Joby and the aviation regulator on preparations for operations.
Anthony El-Khoury, Joby Aviation’s general manager in the UAE, said the company was commissioning the vertiports and continuing aircraft operations as it prepared to introduce commercial passenger services. Joby has conducted piloted test flights in Dubai since June 2025.
The company completed a point-to-point demonstration flight in November 2025 between its test facility at Margham and Al Maktoum International Airport. That flight was part of its testing programme, rather than a commercial passenger service.
Two further vertiports are under development in Downtown Dubai and Palm Jumeirah. Together with VDX and VMR, they are intended to form the initial four-location network, linking the airport to major business, residential and visitor destinations.
Dubai Marina vertiport secures certification for airport air taxis
Related Posts
Add A Comment